Private beta: accepting design partners
For foundries, forges, machine shops and their buyers
Data book verification for castings and forgings, for suppliers and buyers
PartPassport reads the PO and the certificates for a casting or forging order, checks every value against limits from your own licensed standards, and shows it boxed on its page. Heat treatment, NDT, pressure test, dimensional and PMI reports are filed in their sections and counted against the evidence plan. A person reviews and signs. Then it assembles the data book in your customer's index order.
Free to apply. We reply to every application in person.
| C | Mn | Si | P | S |
|---|---|---|---|---|
| 0.21 | 1.02 | 0.44 | 0.012 | 0.008 |
| Rm MPa | Rp0.2 MPa | A % | Z % |
|---|---|---|---|
| 512 | 312 | 27 | 48 |
| 1 | 2 | 3 | Mean |
|---|---|---|---|
| 24 | 15p. 3, box C12 | 22 | 20 |
What does PartPassport do?
PartPassport is a data book verification tool for castings and forgings: it checks certificates and their source records against the PO and the company's own verified limits, files every other report in its section of the book for a person to confirm, links every value to its page, and a person signs the report. It is built by people who compile and review data books, and it is in private beta.
Who is it for?
Suppliers: foundries, forges and machine shops
- Plan the evidence at the PO, before the first pour or forging.
- Catch a missing Charpy result, a wrong heat number, a hydro report that is not in the book or a blank page before your customer does.
- Assemble the book in your customer's index order, with the priced PO left out.
Buyers: supplier quality, EPC document control, inspectors
- See every value boxed on its source page instead of hunting for it.
- Check books against your standing requirements, including special clauses.
- Keep a signed, re-queryable record of what was checked and why.
One flow, the same for every order
Every job follows the same six steps. Nothing is skipped silently.
Customer
Pick the customer the order belongs to.
Requirements card
The customer's standing requirements on one versioned card, confirmed once by a person.
PO
The purchase order is read twice. Prices and commercial terms are dropped.
Documents
The whole package. Certificates and their source records are read; heat treatment, NDT, pressure test, dimensional and PMI reports are filed in their sections and counted against the plan.
Review
Every finding with its evidence boxed on the page. A person decides.
Sign
A signed verification report with a QR check, then the assembled data book.
In a hurry? Quick check skips steps 1 to 3: upload a package, get a report. Files are deleted after 7 days.
Every document in the book, not only the certificate
A casting or forging data book is more than a material certificate. PartPassport reads the purchase order, the certificates and the spectrometer and test reports behind them. Furnace charts and load lists, RT, UT, MT and PT reports, hydrostatic test, dimensional and PMI reports and the certificate of conformance are filed in the section the customer's index names, checked for blank, repeated and missing pages, counted against the evidence plan (a chart for every heat treatment load, a hydro report for every piece) and confirmed by a person on the review. Readers for those reports are next on the roadmap.
| Document | Identity | Pages | Status |
|---|---|---|---|
| Purchase order | PO-SAMPLE-118 rev 2 | 4 | Confirmed, prices dropped |
| Drawing | 4471-C rev C | 2 | Filed: Dimensional |
| Inspection certificate 3.1 | Heat H24-0917 | 3 | Read: 1 value to review |
| Spectrometer printout | Heat H24-0917 | 1 | Read: matches certificate |
| Tensile and Charpy report | Heat H24-0917, lot L-04 | 2 | Read: matches certificate |
| Furnace chart and load list | Load L-04 | 6 | Page 4 of 6 missing |
| UT report | Serials 001 to 008 | 8 | Filed: NDT, confirm by hand |
| MT report | Serials 001 to 008 | 4 | Filed: NDT, confirm by hand |
| Hydrostatic test report | Serials 001 to 008 | 2 | Filed: Pressure test, confirm by hand |
| Dimensional report | Drawing rev C | 3 | Filed: Dimensional, confirm by hand |
| PMI report | Serials 001 to 008 | 1 | Filed: NDT, confirm by hand |
| Certificate of conformance | PO-SAMPLE-118 | 1 | Filed: Purchase order |
Scroll the table sideways for pages and status
Package checks
How PartPassport decides
The model reads. Code decides.
A language model reads the documents. Plain code compares each value with your limit. Critical values are read twice. A value that cannot be found goes to a person, never to pass.
Limits come from your standards
Your team enters limits from its own licensed copies of ASTM, EN, DIN, ISO or JIS, including limits that change with wall thickness. PartPassport ships 456 grade names, not limit values.
Every value has an address
Each value is tied to a document, a page and a box on that page. Anyone reviewing the finding later can see exactly where the number came from.
Start at the PO, not at shipment
Most data book problems are created months before the book is compiled. PartPassport opens an evidence plan when the PO arrives: the evidence required per heat and per line, plus a before-production checklist.
The data book index and compliance matrix can go to your buyer for approval before production. Their reply is recorded.
- Book the inspector for witnessed tests.
- Keep the Charpy bars for each heat treatment lot.
- Keep the furnace chart for every load.
Why data books matter to cash flow
About 10% of PO value
is typically retained on EPC orders for valves, pressure vessels and rotating equipment, released against conditions that include final documentation. Source: Project Materials.
75% of suppliers
reported documentation-related payment holdbacks in a 2016 DocBoss survey of 106 suppliers and EPCs (directional).
4 to 8 hours
for a comprehensive buyer-side review of one manufacturing record book. Source: Energies Media.
What PartPassport will not do
- PartPassport never calls its report a 3.1 or 3.2 certificate, and it is not an authorized inspection representative.
- PartPassport checks documents against the order. It cannot tell whether the metal matches the paper, and reviewing paper cannot catch a well-made forgery. Keep doing PMI, hardness checks and heat number checks on the part; PartPassport says when they are the right next step.
- PartPassport never extracts or stores prices or commercial terms from a PO.
- Limits come only from your company's own licensed standards, never from memory or a language model.
Built by people who build data books
PartPassport is built by people who compile and review data books for castings, forgings and machined parts. It is tested on real orders before it reaches you: real heats, real test bars, real customer index orders.
Practical guides
What is a manufacturer's data book (MDB / MRB)?
What goes in a book for a casting or forging order, and who approves it.
EN 10204 3.1 vs 3.2, explained for castings and forgings
Who signs, what is tested, and what test bars have to do with it.
Why data books get rejected
The four classes of findings and how to catch each one first.
Become a design partner
PartPassport is in private beta. Start with one data book you have already shipped: we walk through it with you in PartPassport on a 30-minute call.